z6尊龙官网

      Service hotline:

      0315-5913666

      +86-18931500255

      Domestic > Shenhua Ningmei Group Dawukou Coal Preparation Plant
      神华宁煤集团公司大武口选煤厂.jpg
      • 神华宁煤集团公司大武口选煤厂.jpg

      Shenhua Ningmei Group Dawukou Coal Preparation Plant

      Type: Coking coal preparation plant

      Scale: 3.8Mt/a

      Contracting mode: design+partial equipment supply, renovation project

      Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, the fine coal slurry is sorted by a flotation machine, the flotation clean coal is dehydrated and recovered by a filter press, and the tail coal slurry water is concentrated by a thickener and then combined with a horizontal settling filtration centrifugal dewatering machine and a filter press for dehydration and recovery. The washing water is closed loop, environmentally friendly and energy-saving.


        XML地图